Levy County High Point Trip Report
Date: October, 1999
Author: Fred Lobdell
This high point is just a few feet north of county 464. From the intersection of US routes
27 & 41 in the center of the village of Williston, go south on 41 about 10 miles.
Turn right (west) on county 464. (This is the last numbered road on the right before entering
Marion County.) Go about 6 miles to a height of land. (This point is about 1.1 miles east of
the intersection of 464 with FL 121.)
Park here and walk into the woods on the south side of
the road. The area is not posted. It was fenced at one time, and the fence posts are still
standing, but the four strands of very rusty barbed wire are lying on the ground.